4.25 MG Roads End Reservoir & Pump Station City of Lincoln City Ongoing $4,537,000.00 Lincoln City, OR Build new 4.25 million gallon water reservoir and pump station to feed it. Demo the existing reservoir.
4.0 MG Peterson Point Reservoir City of Seaside Ongoing $3,701,000.00 Seaside, OR Excavate area and erect new 4.0 million gallon water reservoir
CSO Denver Street Separation City of Astoria Ongoing $778,000 Astoria, OR Install Stormwater utilities
Bank of Astoria - Tillamook Branch Columbia State Bank Ongoing $1,145,000.00 Tillamook, OR Build a new bank building.
Goodman Park Restroom Removal & Replacement City of Seaside Ongoing $157,500 Seaside, OR Demo an existing restroom and rebuild a restroom building on the existing site.
Reserve @ Gearhart Subdivision Reserve @ Gearhart LLC Ongoing $3,262,433 Gearhart, OR Install complete subdivision HDPE piping infastructure and install road systems.
Waste Water Treatment Facilities Tillamook County Ongoing $12,212,208.61 Tillamook, OR Expansion and upgrade of municipal WWTP
WEBB Mitigation Army Corp of Engineers Aug-2008 $5,113,242 Clastkanie, OR Design build construction of wetlands mitigation project / installation of flow control structures.
Seaside Library City of Seaside Jul-2008 $2,200,000 Seaside, OR Turnkey construction of a municipal library.
Hwy 30 Debris Removal (First Responder) Oregon Dept. of Transporation Apr-2008 $1,500,000 Westport, OR Emergency / first responder for debris removal (30,000 yards of slide material), grinding and resurfacing of OR Hwy 30 near Westport, OR
Wastewater Facilities Improvement City of Cannon Beach Sep-2007 $5,095,761 Cannon Beach, OR Installation of new expansion to existing municipal WWTP facility.
Home Depot Surcharge and Subgrade Home Depot Jul-2007 $2,452,667 Warrenton, OR Excavating work and installation of 150,000 ton surcharge within a compressed (six-week) field schedule.
US101: Manzanita-Wheeler Oregon Department of Transportation Mar-2007 $2,755,350 Nehalem, OR Grind / widen / pave and install signage for 4 miles of OR HWY 101 near Nehalem, OR.
Wauna Mill Utility Relocation Georgia Pacific Corporation Jan-2007 $2,678,656 Westport, OR Install multiple HDPE and fiberglass lines as specifiied by design-build piping system bypass plans.
Western Wahkiakum Water System Expansion Wahkiakum County PUD #1 Nov-2006 $1,566,204 Wahkiakum, WA Placed of 30,000 LF of underground water piping and installed 80,000 gallon water storage tank.
Logan Road Tucker Creek Lane Project Clatsop County May-2006 $1,520,057 Astoria, OR Roadwork upgrade consisting of widening, cement treatment and asphalt paving
CSO Smith Point Phase 1 City of Astoria Dec-2005 $1,279,935 Astoria, OR Install 800 LF of 8 ft concrete pipe
CSO Separation Project Overflow No. 44 & 45 City of Astoria Dec-2005 $1,101,658 Astoria, OR Install 15,000 LF of 18" storm pipe as well as manholes, and catch basins.
Port Westward Road Improvements Columbia County Oct-2004 $2,662,477 Clatskanie, OR Roadwork upgrade consisting of widening of existing, waterline installation (9,500 LF) and asphalt paving (21,000 tons)
Ft Stevens State Park South Campground Improvements Oregon Parks & Recreation Sep-2004 $2,163,627 Warrenton, OR Removal and new installation of all underground infastructure and road networks at Fort Stevens State Park (Phase II).
Lewis & Clark Road Construction & Paving Clatsop County Aug-2003 $2,675,533 Seaside, OR Roadwork upgrade consisting of widening (placed 275,000 yards of material) and asphalt paving (placed 8,500 tons).