Sectors
Infrastructure
Install complete subdivision HDPE piping infastructure and install road systems. |
Install 800 LF of 8 ft concrete pipe |
Removal and new installation of all underground infastructure and road networks at Fort Stevens State Park (Phase II). |
Install 15,000 LF of 18" storm pipe as well as manholes, and catch basins. |
Place 30,000 LF of underground water piping and install 80,000 gallon water storage tank for Wahkiakum County, WA. |
Emergency / first responder for debris removal (30,000 yards of slide material), grinding and resurfacing of OR Hwy 30 near Westport, OR |






